ITA concept precinct / 2140
Atlantic transfer terminal · 0.108 km²Enclosed customs and transfer halls connect the offshore arrivals to shore through a separate service tunnel. Cargo is re-marshalled before entering the continental railway.
Sines Gateway Registry / 2140
The European arrival gateway connects the Atlantic railway to port transfer and continental distribution. Its 28 terminal tracks retain their registered alignment; railside unloading connects to separate inland transfer, command and support precincts.
PT / CARTOGRAPHIC RECORD
Atlantic arrivals. Port transfer. Continental distribution.
Satellite / REFERENCE DRAWING
Illustrated Sines gateway over a real coastline and street plan. The existing port, town and industrial context surround six proposed ITA precincts.
Drag to explore · Pinch or Ctrl + scroll to zoom · Keyboard: + / −, arrows, 0 for overview. Position and zoom are retained between views.
© OpenStreetMap contributors · ODbL · ITA additions are fictional
IMAGE LANDMARKS / 12 REFERENCES
Select a landmark to locate it across the five drawings. Numbers refer to visible features in this edition.
Illustrated positions. The bridge and railway retain their separate geographic register.
Existing roads retain their Portuguese proper names from OpenStreetMap. ITA access streets are fictional additions for 2140. Select a street to locate its traced alignment; zoom in to read nearby names.
The map follows the real Sines coastline, harbour breakwaters, streets and local railway. The existing town and industrial facilities remain as context. Six proposed ITA precincts form the gateway programme, with separate access for freight, staff and military support.
ITA concept precinct / 2140
Atlantic transfer terminal · 0.108 km²Enclosed customs and transfer halls connect the offshore arrivals to shore through a separate service tunnel. Cargo is re-marshalled before entering the continental railway.
ITA concept precinct / 2140
Iberian distribution estate · 0.650 km²Freight warehouses, truck staging and regional distribution on the inland side of the port. Heavy traffic uses the industrial access network.
ITA concept precinct / 2140
ITA European gateway command · 0.144 km²Gateway administration, railway coordination, records and technical training, with a separate visitor and staff entrance.
ITA concept precinct / 2140
Gateway military support estate · 0.684 km²A separate support precinct with command, barracks, workshops, medical support and emergency staging. Public transport terminates outside the controlled estate.
ITA concept precinct / 2140
Continental freight exchange · 0.400 km²Transfer reception alongside the inland rail corridor. Consists are divided into compatible onward formations; the map does not assume that the current Portuguese network accepts 2 km trains.
ITA concept precinct / 2140
Gateway energy and maintenance · 0.166 km²Power conversion, water services, maintenance stores and technical support in a separate inland compound.
Areas refer to the complete surface allocations, including internal roads and yards. This fictional 2140 layout does not establish present-day ownership, construction permission or engineering feasibility.
The 28 terminating tracks retain their 3 km service length, 18 m centre spacing and original approach fan. Trains may be up to 2 km long, with 50 m operating clearance at each end. Their position markers identify the centre of the formation.
Fourteen paired-track handling modules serve all 28 berths. Each module provides nine mobile gantries, a 10 m loading strip and a 6 m automated transfer lane. The working strips extend for 2.2 km, with service aprons along the outer edges and two lateral transfer halls. Gantry supports remain outside the track gauge.
Cargo moves from train to gantry, transfer lane and lift, then through a collector beneath the railway deck to the shore tunnel. The collector does not create a level crossing over the active tracks. The approach fan and buffer stops remain clear.
Concept tunnels show separate cargo transfer from the offshore arrivals to the shore terminal and inland exchange. Cargo is re-marshalled for onward services; the present Portuguese network is not assumed to accept 2 km formations. No line is connected through the existing buffer stops, and no new route is added to Project Continuum.
The preserved offshore alignment remains conceptual. Harbour clearance, structural elevations, tunnel gradients and rail interoperability require a separate engineering definition.
Inspect Sines and the preserved tracks on Network →All five views share a 20.00 × 11.16 km north-up frame. The 2D plan and the Network drawing project geographic data directly. The satellite and terrain images interpret that plan; traffic and staff transport are concept overlays. Street labels, descriptions and scale remain outside the image.
Geography: © OpenStreetMap contributors · ODbL. Port and logistics context: APS — ZALSINES and aicep Global Parques — ZILS.